From first call to handover in about twelve months
We analyse your ship and routes to confirm what wind can really deliver.
Where the wings go, aerodynamics, ship stability and operations, with masters and logistics in the room.
Structure, controls, electrical integration, compliance.
Classification society review: the milestone that opens production.
Composite wing modules built and checked.
Systems tested together before they reach the ship.
Installation, crew training and handover.
Our engineering work is supported by specialised AI roles, from naval architecture to structures, aerodynamics, automation and compliance, each covering a precise scope.
A Red Team is always active: it challenges every technical, commercial and regulatory output, looking for the breaking point before reality does.
The classification society has the final technical say. Nothing is built without its approval.